Modular vs traditional construction
This article provides an outline of the important differences between modular and traditional construction methods:
- The term ‘traditional’ is often used to describe the types of linear construction, where each individual step is not only constructed entirely (or largely) on site, but also needs to be completed before the project can move on to the next phase.
- Modular construction is an off-site based construction method, during which individual components are manufactured (or ‘prefabricated’) in a factory, transported to the site entirely (or mostly) complete and assembled on location.
Both construction methods start in the same way – planning, design, approvals, site preparation and development. From that point forward, however, the differences begin:
Image source: Modscape
Pros and Cons of Modular Construction
Pros:
- Thanks to the ability for the project to run simultaneously on-site and in-factory, modular construction can be up to 50% quicker than traditional construction.
- As major parts of construction are handled within a factory, weather conditions are often irrelevant during the majority of the project.
- The factory-based manufacturing process allows not only for greater quality control during the manufacturing process but for many health and safety risks to be considerably reduced, if not eliminated,
- The process aims to minimise waste and reduce the project’s carbon footprint, as fewer people are travelling to the site and modules are produced directly to spec using Computer Aided Manufacturing.
- The impact on the community surrounding the construction site can be significantly reduced, due to much lower levels of noise and traffic during the project period
- The methods employed in modular construction can often benefit the energy efficiency and airtightness of the final construction
Cons:
- Access to the site must be considered from the very beginning, as it will need to allow for the delivery of large modules.
- Traditional construction allows for later design changes, while modular construction is unlikely to be able to factor these in, so early complete design sign off is crucial with clients.
- The logistics and planning of individual module assembly will need rigorous planning to ensure a smooth project.
Ultimately, each project should be considered individually. The method that is selected should match the ultimate desired outcome and the individual limitations of each project.
Featured articles and news
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Comments